Search Forum
Blog Entry# 1832161
Posted: May 04 2016 (16:13)
8 Responses
Last Response: May 05 2016 (15:36)
8 Responses
Last Response: May 05 2016 (15:36)
May 04 2016 (16:13) HDP/Hadapsar (Pune) (3 PFs) | KTE/WDG-3A/14557
ayushkamal^~
ayushkamal^~ 9544 blog postsKTE WDG-3A duos (14557 + 14883) with BCNA consist gets looped at Hadapsar for giving the way to the incoming Express trains's traffic.
3 Posts
Miraj - Pune line (on which Hadapsar is) is under electrification & doubling, Work isnt complete
agree to you... as south of Daund is not electrified... so any train / frieght going ahead of Daund will have Diesel loco... till the time Daund have a electric trip shed, loco change will happen at Pune only...
A little correction there. Hadapsar is on Daund-Pune line. Miraj-Pune line gets separated before Ghorpuri.
Sorry. You are right.
Is daund-Pune line electrified? (IRI atlas says so). If yes, then why diesel loco in this pic?
Is daund-Pune line electrified? (IRI atlas says so). If yes, then why diesel loco in this pic?
Electrification is completed I suppose, but it's not yet operational.