Search Forum
Blog Entry# 1835957
Posted: May 07 2016 (00:41)
6 Responses
Last Response: May 07 2016 (12:12)
6 Responses
Last Response: May 07 2016 (12:12)
Should be made a sf by speeding up in gkp-kir section and should be made a 24 coacher with 1 extra 3ac and sl coach..
1 Posts
Yes.. 7 GN coaches are more than enough..it can be decresed to 5 with two more 3a coaches
There are 9 GS coaches
no, it can't be removed.. even after 9 gs coaches there is no space to place your toe inside GS coach.
no, it can't be removed.. even after 9 gs coaches there is no space to place your toe inside GS coach.
Then a biweekly jansadharan should run on this route but number of general coaches in Amrapali should be reduced..
Bhai sf ka tag hoga bs or extra khch nhi... ds train is doing good in his class..why do u want pay extra for d same service..
This train is still following the old single non electrified line timetable like other trains on this route..so it should be now speeded up along with other trains running in the bbk-bju/kir section