Search Forum
Blog Entry# 1836090
Posted: May 07 2016 (08:27)
8 Responses
Last Response: May 07 2016 (13:02)
8 Responses
Last Response: May 07 2016 (13:02)
May 07 2016 (08:27) 11085/Mumbai LTT - Madgaon AC Double Decker Express AkshayMahapadi~ 890 blog posts
11085 hits REGRET/GNWL on ARP opening date for the first time.
28- 8-2016 AVAILABLE 620
31- 8-2016 AVAILABLE 578
2- 9-2016 GNWL129/WL113
4- 9-2016 ...
more...
28- 8-2016 AVAILABLE 620
31- 8-2016 AVAILABLE 578
2- 9-2016 GNWL129/WL113
4- 9-2016 ...
more...
3 Posts
CR should augment the load to 15-20 normal CC coaches during that period (if DD coaches are not available).
That is totally hopeless train.
It has only one CC and TT is just ridiculous.
9 Hrs for DR-RN and 12:40 hrs for DR-SWV.
Slower than a passenger train.
It has only one CC and TT is just ridiculous.
9 Hrs for DR-RN and 12:40 hrs for DR-SWV.
Slower than a passenger train.
hahahah....
I am not at all concerned with slot of any special train.
I was discussing abt augmenting the load of this train (11085/11086) during that period.
Thanks....!!!!
I am not at all concerned with slot of any special train.
I was discussing abt augmenting the load of this train (11085/11086) during that period.
Thanks....!!!!