Search Forum
Blog Entry# 1948417
Posted: Aug 01 2016 (14:21)
2 Responses
Last Response: Aug 01 2016 (15:20)
2 Responses
Last Response: Aug 01 2016 (15:20)
New Facilities/Technology
![](http://st.indiarailinfo.com/images/1.png)
I.R.needrejuvenation~ 949 news posts
After connecting with Bangladesh through Tripura, Indian Railways plans to link up to Myanmar’s railway network via Moreh in Manipur as part of the Trans-Asian Railway...
read more... India plans Myanmar rail connection | Mizzima
The plan is good but they have to concentrate on pending projects in INDIA ...in India many places are not connected to their respective capital & imp cities...
Rightly said sir, the pending projects badly need quicker completion than ever before. MoR has given more priority to putting in maximum resources on completion of the Pending projects, rather than introducing large number of new trains, as was the practice in IRlys. As a result, rate of BG lines commissioned per day by IRlys has already increased from about 4.5 km/day since last few years to over 7 km/day today. The plan is to increase it to about 19kms/ day in next 3-4 years.
In addition to the above, we still need to open our doors wide open to better, new and futuristic technologies
In addition to the above, we still need to open our doors wide open to better, new and futuristic technologies