Jan 18 2017 (08:03) guest
Entry# 2130918 Past Edits
Jan 18 2017 (14:23)
Guntakal-Wadi electrification and doubling - close to completion
Peddapalli-Nizamabad - Close to completion
Guntur-Guntakal-Bellary electrification - On-going, Guntur-Guntakal stretch in good progress
Bhimavaram-Gudivada-Vijayawada Electrification and doubling - On-going ( Work had practically stopped due to lack of funds, the last time I checked)
Bidar-Gulbarga - Was struggling due to land issues, now going at a brisk pace
Guntakal-Dharmavaram Doubling - No progress
Kacheguda-Mahbubnagar doubling -
Secunderabad-Bolarum electrification - On-going, poles erected
Parbhani-Mudkhed doubling - Slow progress
Obulavaripalle - Krishnapatnam - On-going, Earth work completed for the entire route
Vijayawada-Balharshah tripling - On-going, a short section on the Balharshah end is almost completed ( correct me if I am wrong)
Nadikude-Venkatagiri - Survey going on for land acquisition
Kotipalli - Narsapuram - Survey going on for Kotipalli-Amalapuram section, Tenders to be called soon for New Godavari Bridge
Akola-Akot gauge conversion - Yet to begin
( By D S P Anirudh )
Electrification - Ahmedabad Palanpur , Ahmedabad rajkot , Mahesana viramgam samakhiyali , Gandhidha kandla mundra , Indore mhow ( By Riz )
Jan 18 2017 (14:22)
ECR - DFC , Digha Bridge Doubling,Muzaffarpur Hajipur Doubling,Ramdayalu Hajipur Doubling ( By Subrat)
ER - Narkatiyaganj Rampurhat Raxaul Malda Gc , Bakhtiyarpur Rajgir Electrification (By Rahul )
ER - Rampurhat Malda Electrification , Bardhman Bandel 3rd line , Dankuni Bally 3rd line , Gauge Conversion Balgona Katwa ( By Rahul )
Dankuni Bally Sainthia -Rampurhat 3rd line with electrification , Chandanpur-Dankuni 4th line with electrification , Ahmedpur-Katwa gauge conversion , Katwa - Azimganj electrification , CC link doubling ( By Debarathi)
Gauge ECoR Conversion - Balgona Khurda Katwa Road- Bolangir, Paradeep - Haridaspur, Talcher- Bimalgarh, Puri- Konark, Jagdalpur- Rayagada Doubling, Titlagarh- Visakhapatnam Doubling, Raipur - Titlagarh Doubling, Sambalpur- Talcher- doubling, Talcher- Cuttack tripling, Nergundi- Bhadrak tripling, ( By Rahul afraaz) )
ECoR KR - Roha to Veer Doubling , Roha to Thokur Electrification ( by Konkan)
KR
NFR 1
Ongoing doubling and electrification of ALY-MUV-BSB-ARJ-GCT-BUI-CPR in which doubling is completed between Varanasi City and Aunrihar Jn
rest is under process and is expected to be completed till 2019-20
( By Bruce Wayne )
2
Construction of new line connecting BSB-AMH-GKP
( By Bruce Wayne )
3
Construction of new line connecting MAU to TARIGHAT i
e
NER to ECR project has been started
New line is via Ghazipur Ghat station to Tarighat
( By Bruce Wayne )
5
Electrification of single diesel line from Kanpur Anwarganj - Farrukhabad
( By Bruce Wayne )
6
Electrification of single diesel line from Rampur Jn
- Kathgodam
( By Bruce Wayne )
7
Construction of ELS at GorakhpurJn
, Construction of DEMU shed at Aunrihar Jn
& Construction of Basic Training Centre at Ghazipur
( By Bruce Wayne )
8
Gauge conversion ASH-STP-MLN & GD-BRK ( By Ravi Prakash Shukla )
NFR- New Domohani New Alipurduar Doubling(excluding Jaldhaka, Torsa R
Bridge),KIR RQJ electrification,New y link at New Jalpaiguri ( By Prabir ji )
NWR - DFC , Doubling in Ajmer Palanpur , Phulera Degana , Alwar Bandikui , Gauge conversion in Churu Sikar Jaipur , Mavli - Barisadri , Udaipur - Himmatnagar , Electrification in Ajmer Palanpur, Ajmer Udaipur , Rewari - Phulera
NL dausa ganagapur city , Dungarpur banswara ratlam , Thiyat sanu hamira ( by riz)
SECR - dalli rajhara - raoghat- jagdalpur , korba - pendra road and balaghat- nainpur - sukrimangla guage conversion, raipur -durg tripling , jharsugda- bilaspur quadrupling ( By saurabh)
SWR PTJ-POY gauge conversion
( By Aditya Siddharth) , Villupuram Dindigul doubling, Takkolam Arakkonam new line, Pollachi Podanur Gauge conversion, Sengottai Punalur Gauge Conversion, Charvattur Mangalore electrification, Erode Trichy electrification
( BY SOURAV)
SWR
electrification of MYS-SBC and doubling at S
( By Aditya Siddharth)
Tumkur Kalyandurga new line, Doubling of Yelhanka to Dharmavaram, Hubli to Tumkur Doubling, Guntakal to Vasco da gama doubling ( BY SOURAV)
WR - DFC ,Gauge conversion of Mehsana Kalol , Ahmedabad Himmatnagar , Doubling in Surat Jalgaon
New Line --- Dahod Indore , Chhotaudepur dhar, Somnath kodinar , Patan bhildi , Modasa shamlaji
Gauge conversion ---Kalol mahesana tarnga hill , Ahmedabad himatnagar , Bhuj naliya , Ahmedabad botad , Jetalsar dhasa
Doubling -- Udhna jalgaon , Viramgam samakhiyali , Palanpur samakhiyali , Surendranagar RAJKOT , Vatwa Ahmedabad 3rd line , Vtwa Ahmedabad , Sabarmati 3 n 4 th line , Chitourgadh nimuch , Indore dewas ujjain
Electrification - Ahmedabad Palanpur , Ahmedabad rajkot , Mahesana viramgam samakhiyali , Gandhidha kandla mundra , Indore mhow ( By Riz )
Jan 18 2017 (08:21)
ER - Rampurhat Malda Electrification
Bardhman Bandel 3rd line
Dankuni Bally 3rd line
Gauge Conversion Balgona Katwa ( By Rahul )
WR - DFC , Gauge conversion of Mehsana Kalol , Ahmedabad Himmatnagar , Doubling in Surat Jalgaon
Jan 18 2017 (08:14)
NWR - DFC , Doubling in Ajmer Palanpur , Phulera Degana , Alwar Bandikui , Gauge conversion in Churu Sikar Jaipur , Udaipur - Himmatnagar , Electrification in Ajmer Udaipur , Rewari - Phulera
WCR - Kota Bina doubling , Itarsi Allahabad Electrification
WR - DFC , Gauge conversion of Mehsana Kalol , Ahmedabad Himmatnagar , Doubling in Surat Jalgaon
Jan 18 2017 (08:12)
WCR - Kota Bina doubling
WR - DFC , Gauge conversion of Mehsana Kalol , Ahmedabad Himmatnagar , Doubling in Surat Jalgaon
Jan 18 2017 (08:10)
NWR - DFC , Doubling in Ajmer Palanpur , Phulera Degana , Alwar Bandikui , Gauge conversion in Churu Sikar Jaipur , Udaipur - Himmatnagar , Electrification in Ajmer Udaipur
WR - DFC
Jan 18 2017 (08:06)
ECR - DFC
NCR - DFC
NWR - DFC
WR - DFC
Guntakal-Wadi electrification and doubling - close to completion
Peddapalli-Nizamabad - Close to completion
Guntur-Guntakal-Bellary electrification - On-going, Guntur-Guntakal stretch in good progress
Bhimavaram-Gudivada-Vijayawada Electrification and doubling - On-going ( Work had practically stopped due to lack of funds, the last time I checked)
Bidar-Gulbarga - Was struggling due to land issues, now going at a brisk pace
Guntakal-Dharmavaram Doubling - No progress
Kacheguda-Mahbubnagar doubling -
Secunderabad-Bolarum electrification - On-going, poles erected
Parbhani-Mudkhed doubling - Slow progress
Obulavaripalle - Krishnapatnam - On-going, Earth work completed for the entire route
Vijayawada-Balharshah tripling - On-going, a short section on the Balharshah end is almost completed ( correct me if I am wrong)
Nadikude-Venkatagiri - Survey going on for land acquisition
Kotipalli - Narsapuram - Survey going on for Kotipalli-Amalapuram section, Tenders to be called soon for New Godavari Bridge
Akola-Akot gauge conversion - Yet to begin
( By D S P Anirudh )
Electrification - Ahmedabad Palanpur , Ahmedabad rajkot , Mahesana viramgam samakhiyali , Gandhidha kandla mundra , Indore mhow ( By Riz )
Jan 18 2017 (14:22)
ECR - DFC , Digha Bridge Doubling,Muzaffarpur Hajipur Doubling,Ramdayalu Hajipur Doubling ( By Subrat)
ER - Rampurhat Malda Electrification , Bardhman Bandel 3rd line , Dankuni Bally 3rd line , Gauge Conversion Balgona Katwa ( By Rahul )
Ongoing doubling and electrification of ALY-MUV-BSB-ARJ-GCT-BUI-CPR in which doubling is completed between Varanasi City and Aunrihar Jn
rest is under process and is expected to be completed till 2019-20
( By Bruce Wayne )
2
Construction of new line connecting BSB-AMH-GKP
( By Bruce Wayne )
3
Construction of new line connecting MAU to TARIGHAT i
e
NER to ECR project has been started
New line is via Ghazipur Ghat station to Tarighat
( By Bruce Wayne )
5
Electrification of single diesel line from Kanpur Anwarganj - Farrukhabad
( By Bruce Wayne )
6
Electrification of single diesel line from Rampur Jn
- Kathgodam
( By Bruce Wayne )
7
Construction of ELS at GorakhpurJn
, Construction of DEMU shed at Aunrihar Jn
& Construction of Basic Training Centre at Ghazipur
( By Bruce Wayne )
8
Gauge conversion ASH-STP-MLN & GD-BRK ( By Ravi Prakash Shukla )
NFR- New Domohani New Alipurduar Doubling(excluding Jaldhaka, Torsa R
Bridge),KIR RQJ electrification,New y link at New Jalpaiguri ( By Prabir ji )
NWR - DFC , Doubling in Ajmer Palanpur , Phulera Degana , Alwar Bandikui , Gauge conversion in Churu Sikar Jaipur , Mavli - Barisadri , Udaipur - Himmatnagar , Electrification in Ajmer Palanpur, Ajmer Udaipur , Rewari - Phulera
NL dausa ganagapur city , Dungarpur banswara ratlam , Thiyat sanu hamira ( by riz)
SECR - dalli rajhara - raoghat- jagdalpur , korba - pendra road and balaghat- nainpur - sukrimangla guage conversion, raipur -durg tripling , jharsugda- bilaspur quadrupling ( By saurabh)
( By Aditya Siddharth) , Villupuram Dindigul doubling, Takkolam Arakkonam new line, Pollachi Podanur Gauge conversion, Sengottai Punalur Gauge Conversion, Charvattur Mangalore electrification, Erode Trichy electrification
( BY SOURAV)
SWR
electrification of MYS-SBC and doubling at S
( By Aditya Siddharth)
Tumkur Kalyandurga new line, Doubling of Yelhanka to Dharmavaram, Hubli to Tumkur Doubling, Guntakal to Vasco da gama doubling ( BY SOURAV)
WR - DFC ,
New Line --- Dahod Indore , Chhotaudepur dhar, Somnath kodinar , Patan bhildi , Modasa shamlaji
Gauge conversion ---Kalol mahesana tarnga hill , Ahmedabad himatnagar , Bhuj naliya , Ahmedabad botad , Jetalsar dhasa
Doubling -- Udhna jalgaon , Viramgam samakhiyali , Palanpur samakhiyali , Surendranagar RAJKOT , Vatwa Ahmedabad 3rd line , Vtwa Ahmedabad , Sabarmati 3 n 4 th line , Chitourgadh nimuch , Indore dewas ujjain
Electrification - Ahmedabad Palanpur , Ahmedabad rajkot , Mahesana viramgam samakhiyali , Gandhidha kandla mundra , Indore mhow ( By Riz )
Jan 18 2017 (08:21)
ER - Rampurhat Malda Electrification
Bardhman Bandel 3rd line
Dankuni Bally 3rd line
Gauge Conversion Balgona Katwa ( By Rahul )
WR - DFC , Gauge conversion of Mehsana Kalol , Ahmedabad Himmatnagar , Doubling in Surat Jalgaon
Jan 18 2017 (08:14)
NWR - DFC , Doubling in Ajmer Palanpur , Phulera Degana , Alwar Bandikui , Gauge conversion in Churu Sikar Jaipur , Udaipur - Himmatnagar , Electrification in Ajmer Udaipur , Rewari - Phulera
WCR - Kota Bina doubling , Itarsi Allahabad Electrification
WR - DFC , Gauge conversion of Mehsana Kalol , Ahmedabad Himmatnagar , Doubling in Surat Jalgaon
Jan 18 2017 (08:12)
WCR - Kota Bina doubling
WR - DFC , Gauge conversion of Mehsana Kalol , Ahmedabad Himmatnagar , Doubling in Surat Jalgaon
Jan 18 2017 (08:10)
NWR - DFC , Doubling in Ajmer Palanpur , Phulera Degana , Alwar Bandikui , Gauge conversion in Churu Sikar Jaipur , Udaipur - Himmatnagar , Electrification in Ajmer Udaipur
WR - DFC
Jan 18 2017 (08:06)
ECR - DFC
NCR - DFC
NWR - DFC
WR - DFC
Projects going all over India
This is list of projects going all over India in various zones
Please update your zones project here I will add in main blog with credits
.
CR
ECR...
more...
This is list of projects going all over India in various zones
Please update your zones project here I will add in main blog with credits
.
CR
ECR...
more...
- DFC , Digha Bridge Doubling,Muzaffarpur Hajipur Doubling,Ramdayalu Hajipur Doubling ( By Subrat)
Narkatiyaganj Raxaul Gc , Bakhtiyarpur Rajgir Electrification (By Rahul )
ER - Rampurhat Malda Electrification , Bardhman Bandel 3rd line , Dankuni Bally 3rd line , Gauge Conversion Balgona Katwa ( By Rahul )
Sainthia -Rampurhat 3rd line with electrification , Chandanpur-Dankuni 4th line with electrification , Ahmedpur-Katwa gauge conversion , Katwa - Azimganj electrification , CC link doubling ( By Debarathi)
ECoR - Khurda Road- Bolangir, Paradeep - Haridaspur, Talcher- Bimalgarh, Puri- Konark, Jagdalpur- Rayagada Doubling, Titlagarh- Visakhapatnam Doubling, Raipur - Titlagarh Doubling, Sambalpur- Talcher- doubling, Talcher- Cuttack tripling, Nergundi- Bhadrak tripling, ( By afraaz)
KR - Roha to Veer Doubling , Roha to Thokur Electrification ( by Konkan)
NCR - DFC
NER
1. Ongoing doubling and electrification of ALY-MUV-BSB-ARJ-GCT-BUI-CPR in which doubling is completed between Varanasi City and Aunrihar Jn. rest is under process and is expected to be completed till 2019-20. ( By Bruce Wayne )
2. Construction of new line connecting BSB-AMH-GKP. ( By Bruce Wayne )
3. Construction of new line connecting MAU to TARIGHAT i.e. NER to ECR project has been started. New line is via Ghazipur Ghat station to Tarighat. ( By Bruce Wayne )
5. Electrification of single diesel line from Kanpur Anwarganj - Farrukhabad. ( By Bruce Wayne )
6. Electrification of single diesel line from Rampur Jn.- Kathgodam. ( By Bruce Wayne )
7. Construction of ELS at GorakhpurJn. , Construction of DEMU shed at Aunrihar Jn. & Construction of Basic Training Centre at Ghazipur. ( By Bruce Wayne )
8. Gauge conversion ASH-STP-MLN & GD-BRK ( By Ravi Prakash Shukla )
NFR- New Domohani New Alipurduar Doubling(excluding Jaldhaka, Torsa R. Bridge),KIR RQJ electrification,New y link at New Jalpaiguri ( By Prabir ji )
NR
NWR - DFC , Doubling in Ajmer Palanpur , Phulera Degana , Alwar Bandikui , Gauge conversion in Churu Sikar Jaipur , Mavli - Barisadri , Udaipur - Himmatnagar , Electrification in Ajmer Palanpur, Ajmer Udaipur , Rewari - Phulera
NL dausa ganagapur city , Dungarpur banswara ratlam , Thiyat sanu hamira ( by riz)
SCR
Guntakal-Wadi electrification and doubling - close to completion
Peddapalli-Nizamabad - Close to completion
Guntur-Guntakal-Bellary electrification - On-going, Guntur-Guntakal stretch in good progress.
Bhimavaram-Gudivada-Vijayawada Electrification and doubling - On-going ( Work had practically stopped due to lack of funds, the last time I checked)
Bidar-Gulbarga - Was struggling due to land issues, now going at a brisk pace.
Guntakal-Dharmavaram Doubling - No progress
Kacheguda-Mahbubnagar doubling -
Secunderabad-Bolarum electrification - On-going, poles erected.
Parbhani-Mudkhed doubling - Slow progress
Obulavaripalle - Krishnapatnam - On-going, Earth work completed for the entire route.
Vijayawada-Balharshah tripling - On-going, a short section on the Balharshah end is almost completed ( correct me if I am wrong).
Nadikude-Venkatagiri - Survey going on for land acquisition
Kotipalli - Narsapuram - Survey going on for Kotipalli-Amalapuram section, Tenders to be called soon for New Godavari Bridge.
Akola-Akot gauge conversion - Yet to begin. ( By D S P Anirudh )
SECR - dalli rajhara - raoghat- jagdalpur , korba - pendra road and balaghat- nainpur - sukrimangla guage conversion, raipur -durg tripling , jharsugda- bilaspur quadrupling ( By saurabh)
SER
SR
PTJ-POY gauge conversion. ( By Aditya Siddharth) , Villupuram Dindigul doubling, Takkolam Arakkonam new line, Pollachi Podanur Gauge conversion, Sengottai Punalur Gauge Conversion, Charvattur Mangalore electrification, Erode Trichy electrification. ( BY SOURAV)
SWR
electrification of MYS-SBC and doubling at S. ( By Aditya Siddharth)
Tumkur Kalyandurga new line, Doubling of Yelhanka to Dharmavaram, Hubli to Tumkur Doubling, Guntakal to Vasco da gama doubling ( BY SOURAV)
WCR - Kota Bina doubling , Itarsi Allahabad Electrification
WR - DFC ,
New Line --- Dahod Indore , Chhotaudepur dhar, Somnath kodinar , Patan bhildi , Modasa shamlaji
Gauge conversion ---Kalol mahesana tarnga hill , Ahmedabad himatnagar , Bhuj naliya , Ahmedabad botad , Jetalsar dhasa
Doubling -- Udhna jalgaon , Viramgam samakhiyali , Palanpur samakhiyali , Surendranagar RAJKOT , Vatwa Ahmedabad 3rd line , Vtwa Ahmedabad , Sabarmati 3 n 4 th line , Chitourgadh nimuch , Indore dewas ujjain
Electrification - Ahmedabad Palanpur , Ahmedabad rajkot , Mahesana viramgam samakhiyali , Gandhidha kandla mundra , Indore mhow ( By Riz )
Narkatiyaganj Raxaul Gc , Bakhtiyarpur Rajgir Electrification (By Rahul )
ER - Rampurhat Malda Electrification , Bardhman Bandel 3rd line , Dankuni Bally 3rd line , Gauge Conversion Balgona Katwa ( By Rahul )
Sainthia -Rampurhat 3rd line with electrification , Chandanpur-Dankuni 4th line with electrification , Ahmedpur-Katwa gauge conversion , Katwa - Azimganj electrification , CC link doubling ( By Debarathi)
ECoR - Khurda Road- Bolangir, Paradeep - Haridaspur, Talcher- Bimalgarh, Puri- Konark, Jagdalpur- Rayagada Doubling, Titlagarh- Visakhapatnam Doubling, Raipur - Titlagarh Doubling, Sambalpur- Talcher- doubling, Talcher- Cuttack tripling, Nergundi- Bhadrak tripling, ( By afraaz)
KR - Roha to Veer Doubling , Roha to Thokur Electrification ( by Konkan)
NCR - DFC
NER
1. Ongoing doubling and electrification of ALY-MUV-BSB-ARJ-GCT-BUI-CPR in which doubling is completed between Varanasi City and Aunrihar Jn. rest is under process and is expected to be completed till 2019-20. ( By Bruce Wayne )
2. Construction of new line connecting BSB-AMH-GKP. ( By Bruce Wayne )
3. Construction of new line connecting MAU to TARIGHAT i.e. NER to ECR project has been started. New line is via Ghazipur Ghat station to Tarighat. ( By Bruce Wayne )
5. Electrification of single diesel line from Kanpur Anwarganj - Farrukhabad. ( By Bruce Wayne )
6. Electrification of single diesel line from Rampur Jn.- Kathgodam. ( By Bruce Wayne )
7. Construction of ELS at GorakhpurJn. , Construction of DEMU shed at Aunrihar Jn. & Construction of Basic Training Centre at Ghazipur. ( By Bruce Wayne )
8. Gauge conversion ASH-STP-MLN & GD-BRK ( By Ravi Prakash Shukla )
NFR- New Domohani New Alipurduar Doubling(excluding Jaldhaka, Torsa R. Bridge),KIR RQJ electrification,New y link at New Jalpaiguri ( By Prabir ji )
NR
NWR - DFC , Doubling in Ajmer Palanpur , Phulera Degana , Alwar Bandikui , Gauge conversion in Churu Sikar Jaipur , Mavli - Barisadri , Udaipur - Himmatnagar , Electrification in Ajmer Palanpur, Ajmer Udaipur , Rewari - Phulera
NL dausa ganagapur city , Dungarpur banswara ratlam , Thiyat sanu hamira ( by riz)
SCR
Guntakal-Wadi electrification and doubling - close to completion
Peddapalli-Nizamabad - Close to completion
Guntur-Guntakal-Bellary electrification - On-going, Guntur-Guntakal stretch in good progress.
Bhimavaram-Gudivada-Vijayawada Electrification and doubling - On-going ( Work had practically stopped due to lack of funds, the last time I checked)
Bidar-Gulbarga - Was struggling due to land issues, now going at a brisk pace.
Guntakal-Dharmavaram Doubling - No progress
Kacheguda-Mahbubnagar doubling -
Secunderabad-Bolarum electrification - On-going, poles erected.
Parbhani-Mudkhed doubling - Slow progress
Obulavaripalle - Krishnapatnam - On-going, Earth work completed for the entire route.
Vijayawada-Balharshah tripling - On-going, a short section on the Balharshah end is almost completed ( correct me if I am wrong).
Nadikude-Venkatagiri - Survey going on for land acquisition
Kotipalli - Narsapuram - Survey going on for Kotipalli-Amalapuram section, Tenders to be called soon for New Godavari Bridge.
Akola-Akot gauge conversion - Yet to begin. ( By D S P Anirudh )
SECR - dalli rajhara - raoghat- jagdalpur , korba - pendra road and balaghat- nainpur - sukrimangla guage conversion, raipur -durg tripling , jharsugda- bilaspur quadrupling ( By saurabh)
SER
SR
PTJ-POY gauge conversion. ( By Aditya Siddharth) , Villupuram Dindigul doubling, Takkolam Arakkonam new line, Pollachi Podanur Gauge conversion, Sengottai Punalur Gauge Conversion, Charvattur Mangalore electrification, Erode Trichy electrification. ( BY SOURAV)
SWR
electrification of MYS-SBC and doubling at S. ( By Aditya Siddharth)
Tumkur Kalyandurga new line, Doubling of Yelhanka to Dharmavaram, Hubli to Tumkur Doubling, Guntakal to Vasco da gama doubling ( BY SOURAV)
WCR - Kota Bina doubling , Itarsi Allahabad Electrification
WR - DFC ,
New Line --- Dahod Indore , Chhotaudepur dhar, Somnath kodinar , Patan bhildi , Modasa shamlaji
Gauge conversion ---Kalol mahesana tarnga hill , Ahmedabad himatnagar , Bhuj naliya , Ahmedabad botad , Jetalsar dhasa
Doubling -- Udhna jalgaon , Viramgam samakhiyali , Palanpur samakhiyali , Surendranagar RAJKOT , Vatwa Ahmedabad 3rd line , Vtwa Ahmedabad , Sabarmati 3 n 4 th line , Chitourgadh nimuch , Indore dewas ujjain
Electrification - Ahmedabad Palanpur , Ahmedabad rajkot , Mahesana viramgam samakhiyali , Gandhidha kandla mundra , Indore mhow ( By Riz )
please wait...Translate to English
please wait...Translate to Hindi
39 Public Posts - Wed Jan 18, 2017
4 Public Posts - Thu Jan 19, 2017
1 Public Posts - Sat Jan 21, 2017
3 Public Posts - Mon Jan 23, 2017
1 Public Posts - Tue Jan 24, 2017
1 Public Posts - Mon Jan 30, 2017
4 Public Posts - Wed Feb 01, 2017
Raipur Durg triple are you serious 😪😪😨
please wait...Translate to English
please wait...Translate to Hindi
5 Public Posts - Thu Feb 02, 2017
1 Public Posts - Sat Apr 29, 2017