Apr 27 2017 (07:07) SUNR/Surendranagar Junction (6 PFs)
Anupam Enosh Sarkar^~
Anupam Enosh Sarkar^~ 32882 blog postsTender for Electrification of Surendranagar-Pipavav Section of WR Bhavnagar Div.
10 Posts
did electrification started from Pipav to Surendranagar. at ground zero
As per IRI its showing Construction. Single line electrification
As per IRI its showing Construction. Single line electrification
No atlas needs to be updated Bhaiji. Not even hole digging has begun.
This would be High Rise most prolly as double stack container freights ply on this route.