Search Forum
Blog Entry# 2393246
Posted: Aug 29 2017 (01:00)
6 Responses
Last Response: Aug 29 2017 (18:35)
6 Responses
Last Response: Aug 29 2017 (18:35)
1 Posts
Thanks to army people. You see that temporary road on the right side, over water. That was made with the help of army and was very important for escalating the laying of boulders from the other side.
yea.down line would be constructed from next week,it will take 30 days to be done ...
i mean to say only single track is prepared and certified fit.from next week other track will start repairing .it will take 30 days or so.
I got that. I was just enquiring if you have any news about the kind repair proposed for the other line i.e. whether it will be a pakka bridge by extending the present bridge or same as done with the UP line.