Search Forum
Blog Entry# 2555218
Posted: Oct 18 2017 (21:23)
2 Responses
Last Response: Aug 24 2018 (02:04)
2 Responses
Last Response: Aug 24 2018 (02:04)
To Carry Out Soil Investigation For Design Of Foundation, Development Of Design And Drawing For Proposed Minor / Major Bridges To Be Built By Psc / Composit Girder / Box Bridge With Proposed Span, Setting Out The Curve / Transition For A Speed Of 160 Km And Fixing Pillars For The Same Between Chhitauni Â?? Tamkuhi With Submission Of Comprehensive Report In Chhitani-Tamkuhi Section In Connection With New Line Of Chhitauni-Tamkuhi Road Of Varanasi Division Of N.E. Railway.