Good news
BCY is under poles. In coming months I believe there will be some news about electrification.
Also on MUV-ALY stretch upto Saidabad holes and poles are visible
BCY is under poles. In coming months I believe there will be some news about electrification.
Also on MUV-ALY stretch upto Saidabad holes and poles are visible
7 Posts
Then I believe within 2-3 months BCY ARJ ki CRS notification aani chahiye
Is BCY-BSB electrified..?
ALY-MUV m doubling work k koi progress?
ALY-MUV m doubling work k koi progress?
Poles are placed and almost 80-85% straighting is done b/w BCY n BSB
ALY-MUV doubling is also in progress...could see work in patches
ALY-MUV doubling is also in progress...could see work in patches
Between BSB and MUV poles along with clamps are placed.
Line going to DLW from MUV yard is even wired
Line going to DLW from MUV yard is even wired