Search Forum
Blog Entry# 2616140
Posted: Nov 02 2017 (14:47)
17 Responses
Last Response: Nov 05 2017 (08:57)
17 Responses
Last Response: Nov 05 2017 (08:57)
Politics
WR/Western
Harsh11953~ 305 news posts
Mumbai: Terming the proposed Bullet Train project as yet “another bullet fired at the economy” by Prime Minister Narendra Modi, the Congress’ Maharashtra unit on Wednesday...
7 Public Posts - Thu Nov 02, 2017
6 Public Posts - Fri Nov 03, 2017
* For Mum Ahm project to break even, daily 39000 pax (19500 pax each way) shall be required (with Rs 3500 fare), which only a small fraction of businessmen can afford. At such a high fare, bullet train shall be out of reach for small & medium size businessmen. Fare of Bullet train has to be within the reach of a significant fraction of general (non-business) traveller, else daily traffic shall to much lower than the break even level.
* Out of 5000 air pax per day between Mum-Ahm, Bullet train can attract 4000 per day, about 2000 ac rail travellers and another 2000 from private car/taxi/luxury buses totalling to about 9000. But it is possible only if its...
more...
* Out of 5000 air pax per day between Mum-Ahm, Bullet train can attract 4000 per day, about 2000 ac rail travellers and another 2000 from private car/taxi/luxury buses totalling to about 9000. But it is possible only if its...
more...
2 Public Posts - Fri Nov 03, 2017
1 Public Posts - Sun Nov 05, 2017