Search Forum
Blog Entry# 3098447
Posted: Feb 12 2018 (17:21)
4 Responses
Last Response: Feb 13 2018 (09:59)
4 Responses
Last Response: Feb 13 2018 (09:59)
Is there any news of doubling the gardhrubeshwar adra rail line.i know survey for the same is allotted this year.whether any allocation for it is made its doubling or not.
Yes, only that will be done. I don't think railway will be able double that part. Already CNI-BURN will be tripled. Now, if Gardhrubeswar-Adra is doubled then the intermediate needs to have 5 lines. Railways doesn't hold that much amount of land to do this.
Bt trains from hwh to prr will suffer.bt grb posseses one side of d down platform which is empty.so dat can be used.bt its also required as many trains face a lot of delay due to this.also time travel btwn adra n prr can be reduced if it is done