Search Forum
Blog Entry# 3164165
Posted: Mar 02 2018 (23:48)
3 Responses
Last Response: Mar 03 2018 (13:23)
3 Responses
Last Response: Mar 03 2018 (13:23)
Secunderabad (towards moulali) new pitlines construction jarugutondi. Tirupathi lo kuda ila pitlines penchithe bagundu. Ippudu tirupathi lo pitline lo ki vellali ante train platform vacate chesi renigunta side konchem duram ravali tarvata malli venakaki vellali. Pitlines platform rendu pakka pakkane untayi. Train ending oka station lo avvali ante atleast 30 min platform kavalsi vastondi. Pitline ki vellemundu train nundi passengers andaru digipovali. Tarvata bedsheets anni dimpesukovali. Parcel van lo unna luggage motham dimapali. Eelopu plastic bottles erukovadaniki chala mandi tirugutu unnaru. Eemadya mari ekkuvaga kanipistunnaru. Malli locos adjustment chesukovali. 30 min atleast padutundi. Next vache trains delay avutu untayi
There is no place beside station to increase pitlines. Moreover 6th platform and station are being developed aLong with parking space in South side. Even to Move train front and move back into pitline is not possible because there is a railway gate and also houses and buildings in West side . 3 parking Lines are ready outside the station about a km from Stn towards renigunta station but connection. Is not given from last 10 months.
2 Public Posts - Sat Mar 03, 2018