Search Forum
Blog Entry# 3292830
Posted: Apr 11 2018 (23:50)
24 Responses
Last Response: Apr 13 2018 (00:22)
24 Responses
Last Response: Apr 13 2018 (00:22)
Which will be the first SWR train to get E-Loco change at Kalaburagi?
.
Please dont vote for KK. Ref: /blog/post/3292830 . It will be at WADI.
.
Please change your votes.
....
more...
.
Please dont vote for KK. Ref: /blog/post/3292830 . It will be at WADI.
.
Please change your votes.
....
more...
NO vote
Karnataka Superfast Express.
48%
15
Basava Express.
10%
3
UBL - SC Express.
35%
11
YPR - ADI Express.
3%
1
MYS - BSB Express.
0%
0
YPR - JP Suvidha Express.
3%
1
19 Posts
No. I am talking about UBL-SC.
KJM EMD starts its cycle from SBC with SBC-UBL passenger and continues as UBL-SC --> 12604 --> 12747 -->12748 --> 17229 --> 17230 --> 12603 --> SC-UBL and back to SBC with passenger.
Anyhow soon this cycle will break because of electrification works happening in PGDP-NLPD stretch. Poles are erected throughout the stretch and wiring is left in small stretches now.
Once...
more...
KJM EMD starts its cycle from SBC with SBC-UBL passenger and continues as UBL-SC --> 12604 --> 12747 -->12748 --> 17229 --> 17230 --> 12603 --> SC-UBL and back to SBC with passenger.
Anyhow soon this cycle will break because of electrification works happening in PGDP-NLPD stretch. Poles are erected throughout the stretch and wiring is left in small stretches now.
Once...
more...
Even for other passing trains, traction change will happen mostly at Wadi only, as it is already crew change point. GR can take up LC for passing trains when it has both minimum infra to handle Elocos, as well as lobby for crew for these passing trains setup there.
This is one of the reasons why trains like Venkatadri, KCG-CGL etc. which follows KCG-DHONE-GY-RU route are still plying with Dloco till RU.
GY can do LC, Dhone is crew change point both can't do two things right now. I have heard that a...
more...
This is one of the reasons why trains like Venkatadri, KCG-CGL etc. which follows KCG-DHONE-GY-RU route are still plying with Dloco till RU.
GY can do LC, Dhone is crew change point both can't do two things right now. I have heard that a...
more...
Good to know.
Soon we can see LC at GR then.
Hope the KLU-GTL line is commissioned ASAP.
Soon we can see LC at GR then.
Hope the KLU-GTL line is commissioned ASAP.
After GTL-KLU line gets electrified we can have more number of trains being hauled by elocos from SBC side towards SC and CSTM like Basava and YPR-SUR SF exp