May 06 2018 (20:02) 13024/Gaya - Howrah Express (PT) | BGP/Bhagalpur Junction (6 PFs)
Railadventures~
Railadventures~ 2776 blog postsEntry# 3388056 Tags Past Edits
May 08 2018 (07:19)
) Laxmipur borang, Shivnarayanpur and Kahalgaon has now new long and widenew Fob FOb svrp Svrp is getting a new long platform platform, going construction on is under progress
) There is caution before lailakh and train moves at as slow as 10-15kmph for7-8 8-10 min before lailakh mamalka station
So Bgp to Clg takes 45 min to cover 30 km distance
) Between lailakh mamlka to Ekchari even ground work for doubling not completed andtwo one bridge before and after Ekchari at night I missed glimpses but long they before are will far get away completed from 10km completion and this section of 10 km where work is @0% just beginning 2020 will it get might completed take and to around 2020 as during monsoon the work will be stopped disrupted as it comes in flood prone area
Flood prone area
9
) Bharawa to Bonidanga Link Cabin holes has been been cemented and few poles has been also kept but not fixed yet this part of electrification comes under Pakur Malda Electrification whose progress is too slow even when that is Ghy Hwh main line and lot of reputed train run through this route
It cant be completed in 2018 no wires all the way even poles not fixed everywhere
May 08 2018 (07:02)
Bhagalpur 1 to Lailakh mamlka doubling will complete this year 100% sure may be commissioned in Jan 2019 all sleeper in 14 km section laid out of all 30 km left has been done and track is lying beside sleeper so 15 km section completion is guaranteed now,I am traveling with Gaya Howrah today
) Bhagalpur to Lailakh mamlka doubling will complete this year 100% sure may be commissioned in Jan 2019 all sleeper in 14 km section laid out of all 30 km left has been done and track is lying beside sleeper so 15 km section completion is guaranteed now,I am traveling with Gaya Howrah today
third 2 small bridge at bholanathpul has been set today for this block was taken
Doubling ) of Third Kahalgaon small to bridge pirpaithi at bholanathpul has been commissioned set now today well up this line block towards was kiul taken all signal working and used
All 3 remains of Kahalgaon old rob cleared new rob work is going on fastly base created already
) Doubling of Kahalgaon to Pirpaithi has been commissioned now well confirmed both track working all signal working and used for up line towards kiul
4
) All remains of Kahalgaon old rob cleared new rob work is going on fastly base created already
One 5 last ROB will be blast built during British just before pirpaithi station before electrifiction work as height is too low it was not disturbance to doubling so still intact,but soon it will be broken
Laxmipur ) borang,Shivnarayanpur One and last Clg ROB has will long be and blast wide built new during FOb British and just svrp before Pirpaithi station before electrification work as height is getting too long low platform it going was on not disturbance to doubling so still intact,but soon it will be broken
There 6 is caution before lailakh and train moves at as slow as 10-15kmph for 7-8 min before lailakh station
) Laxmipur borang, Shivnarayanpur and Kahalgaon has long and wide new FOb and svrp is getting long platform going on
Between 7 lailakh mamlka to Ekchari even ground work for doubling not completed and two bridge before and after Ekchari at night I missed glimpses but long before will get completed 10km work is @0% just beginning 2020 it might take to commissioned as during monsoon the work will be stopped
) There is caution before lailakh and train moves at as slow as 10-15kmph for 7-8 min before lailakh mamalka station
8
) Between lailakh mamlka to Ekchari even ground work for doubling not completed and two bridge before and after Ekchari at night I missed glimpses but long before will get completed 10km work is @0% just beginning 2020 it might take to commissioned as during monsoon the work will be stopped
May 06 2018 (23:36)
Bhagalpur to Lailakh mamlka doubling will complete this year 100% sure may be commissioned in Jan 2019 all sleeper in 14 km section laid out of all 30 km left has been done and track is lying beside sleeper so 15 km section completion is guaranteed now,I am traveling with Gaya Howrah today
One last ROB will be blast built during British just before pirpaithi station before electrifiction work as height is too low it was not disturbance to doubling so still intact,but soon it will be brokenLaxmipur borang,Shivnarayanpur and Clg has long and wide new FOb and svrp is getting long platform going on
Laxmipur borang,Shivnarayanpur and Clg has long and wide new FOb and svrp is getting long platform going on
May 06 2018 (21:10)
Bhagalpur to Lailakh mamlka doubling will complete this year 100% sure may be commissioned in Jan2018 2019 all sleeper in 14 km section out of all 30 km left has been done and track is lying beside sleeper so 15 km section is guaranteed now,I am traveling Gaya Howrah today
May 06 2018 (21:06)
Station Tag: Sahibganj/SBG added by ™Archana Superfast®~/778159
May 06 2018 (21:06)
Station Tag: Pirpainti/PPT added by ™Archana Superfast®~/778159
May 06 2018 (21:06)
Station Tag: Kahalgaon/CLG added by ™Archana Superfast®~/778159
May 06 2018 (21:06)
Station Tag: Bhagalpur Junction/BGP added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Mirza Cheuki/MZC added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Laxmipur Bhoran/LBNG added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Ghoga/GGA added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Lailakh Mamalkha/LMM added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Sabaur/SBO added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Ekchari/EKC added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Kahalgaon/CLG added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Pirpainti/PPT added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Shivanarayanpur/SVRP added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Sahibganj/SBG added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Anand Vihar Terminal - Malda Town Weekly Express/13430 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Malda Town - Anand Vihar Terminal Weekly Express/13429 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Farakka Express (via Sultanpur)/13413 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Farakka Express (via Faizabad)/13484 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Farakka Express (via Faizabad)/13483 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Danapur - Sahibganj InterCity Express/13236 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Sahibganj - Danapur InterCity Express/13235 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Jamalpur - Malda Town Intercity Express/13410 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Malda Town - Jamalpur Intercity Express/13409 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Jamalpur - Howrah Super Express/13072 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Howrah - Jamalpur Super Express/13071 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Howrah - Gaya Express/13023 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Gaya - Howrah Express/13024 added by ™Archana Superfast®~/778159
May 06 2018 (20:42)
One last ROB will be blast built during British just before pirpaithi station before electrifiction work as height is too low it was not disturbance to doubling so still intact,but soon it will be broken Laxmipur borang,Shivnarayanpur and Clg has long and wide new FOb and svrp is getting long platform going on
There is caution before lailakh and train moves at as slow as 10-15kmph for 7-8 min before lailakh station
Between lailakh mamlka to Ekchari even ground work for doubling not completed and two bridge before and after Ekchari at night I missed glimpses but long before will get completed 10km work is @0% just beginning 2020 it might take to commissioned as during monsoon the work will be stopped
Flood prone area
May 06 2018 (20:20)
Doubling of Kahalgaon to pirpaithi has been commissioned now well confirmed both track working all signal working and used for up line towards kiul
All remains of Kahalgaon old rob cleared new rob work is going on fastly base created already
) Laxmipur borang, Shivnarayanpur and Kahalgaon has now new long and wide
) There is caution before lailakh and train moves at as slow as 10-15kmph for
So Bgp to Clg takes 45 min to cover 30 km distance
) Between lailakh mamlka to Ekchari even ground work for doubling not completed and
9
) Bharawa to Bonidanga Link Cabin holes has been been cemented and few poles has been also kept but not fixed yet this part of electrification comes under Pakur Malda Electrification whose progress is too slow even when that is Ghy Hwh main line and lot of reputed train run through this route
It cant be completed in 2018 no wires all the way even poles not fixed everywhere
May 08 2018 (07:02)
) Bhagalpur to Lailakh mamlka doubling will complete this year 100% sure may be commissioned in Jan 2019 all sleeper in 14 km section laid out of all 30 km left has been done and track is lying beside sleeper so 15 km section completion is guaranteed now,I am traveling with Gaya Howrah today
) Doubling of Kahalgaon to Pirpaithi has been commissioned now well confirmed both track working all signal working and used for up line towards kiul
4
) All remains of Kahalgaon old rob cleared new rob work is going on fastly base created already
) Laxmipur borang, Shivnarayanpur and Kahalgaon has long and wide new FOb and svrp is getting long platform going on
) There is caution before lailakh and train moves at as slow as 10-15kmph for 7-8 min before lailakh mamalka station
8
) Between lailakh mamlka to Ekchari even ground work for doubling not completed and two bridge before and after Ekchari at night I missed glimpses but long before will get completed 10km work is @0% just beginning 2020 it might take to commissioned as during monsoon the work will be stopped
May 06 2018 (23:36)
Bhagalpur to Lailakh mamlka doubling will complete this year 100% sure may be commissioned in Jan 2019 all sleeper in 14 km section laid out of all 30 km left has been done and track is lying beside sleeper so 15 km section completion is guaranteed now,I am traveling with Gaya Howrah today
One last ROB will be blast built during British just before pirpaithi station before electrifiction work as height is too low it was not disturbance to doubling so still intact,but soon it will be broken
Laxmipur borang,Shivnarayanpur and Clg has long and wide new FOb and svrp is getting long platform going on
May 06 2018 (21:10)
Bhagalpur to Lailakh mamlka doubling will complete this year 100% sure may be commissioned in Jan
May 06 2018 (21:06)
Station Tag: Sahibganj/SBG added by ™Archana Superfast®~/778159
May 06 2018 (21:06)
Station Tag: Pirpainti/PPT added by ™Archana Superfast®~/778159
May 06 2018 (21:06)
Station Tag: Kahalgaon/CLG added by ™Archana Superfast®~/778159
May 06 2018 (21:06)
Station Tag: Bhagalpur Junction/BGP added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Mirza Cheuki/MZC added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Laxmipur Bhoran/LBNG added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Ghoga/GGA added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Lailakh Mamalkha/LMM added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Sabaur/SBO added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Ekchari/EKC added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Kahalgaon/CLG added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Pirpainti/PPT added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Shivanarayanpur/SVRP added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Station Tag: Sahibganj/SBG added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Anand Vihar Terminal - Malda Town Weekly Express/13430 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Malda Town - Anand Vihar Terminal Weekly Express/13429 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Farakka Express (via Sultanpur)/13413 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Farakka Express (via Faizabad)/13484 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Farakka Express (via Faizabad)/13483 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Danapur - Sahibganj InterCity Express/13236 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Sahibganj - Danapur InterCity Express/13235 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Jamalpur - Malda Town Intercity Express/13410 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Malda Town - Jamalpur Intercity Express/13409 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Jamalpur - Howrah Super Express/13072 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Howrah - Jamalpur Super Express/13071 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Howrah - Gaya Express/13023 added by ™Archana Superfast®~/778159
May 06 2018 (21:05)
Train Tag: Gaya - Howrah Express/13024 added by ™Archana Superfast®~/778159
May 06 2018 (20:42)
One last ROB will be blast built during British just before pirpaithi station before electrifiction work as height is too low it was not disturbance to doubling so still intact,but soon it will be broken Laxmipur borang,Shivnarayanpur and Clg has long and wide new FOb and svrp is getting long platform going on
There is caution before lailakh and train moves at as slow as 10-15kmph for 7-8 min before lailakh station
Between lailakh mamlka to Ekchari even ground work for doubling not completed and two bridge before and after Ekchari at night I missed glimpses but long before will get completed 10km work is @0% just beginning 2020 it might take to commissioned as during monsoon the work will be stopped
Flood prone area
May 06 2018 (20:20)
Doubling of Kahalgaon to pirpaithi has been commissioned now well confirmed both track working all signal working and used for up line towards kiul
All remains of Kahalgaon old rob cleared new rob work is going on fastly base created already
1.) Bhagalpur to Lailakh mamlka doubling will complete this year 100% sure may be commissioned in Jan 2019 all sleeper in 14 km section laid out of all 30 km left has been done and track is lying beside sleeper so 15 km section completion is guaranteed now,I am traveling with Gaya Howrah today.
2.) Third small bridge at bholanathpul has been set today for this block was taken.
3.) Doubling of Kahalgaon to Pirpaithi has been commissioned now well confirmed both track working all signal working and used for up line...
more...
2.) Third small bridge at bholanathpul has been set today for this block was taken.
3.) Doubling of Kahalgaon to Pirpaithi has been commissioned now well confirmed both track working all signal working and used for up line...
more...
towards kiul.
4.) All remains of Kahalgaon old rob cleared new rob work is going on fastly base created already.
5.) One last ROB will be blast built during British just before Pirpaithi station before electrification work as height is too low it was not disturbance to doubling so still intact,but soon it will be broken.
6.) Laxmipur borang, Shivnarayanpur and Kahalgaon has now new long and wide Fob and Svrp is getting a new long platform, construction is under progress.
7.) There is caution before lailakh and train moves at as slow as 10-15kmph for 8-10 min before lailakh mamalka station.So Bgp to Clg takes 45 min to cover 30 km distance.
8.) Between lailakh mamlka to Ekchari even ground work for doubling not completed and one bridge before and after Ekchari at night I missed glimpses but they are far away from completion and this section of 10 km where work is @0% just beginning will get completed and commissioned around 2020 as during monsoon the work will be disrupted as it comes in flood prone area.
9.) Bharawa to Bonidanga Link Cabin holes has been been cemented and few poles has been also kept but not fixed yet this part of electrification comes under Pakur Malda Electrification whose progress is too slow even when that is Ghy Hwh main line and lot of reputed train run through this route.It cant be completed in 2018 no wires all the way even poles not fixed everywhere.
4.) All remains of Kahalgaon old rob cleared new rob work is going on fastly base created already.
5.) One last ROB will be blast built during British just before Pirpaithi station before electrification work as height is too low it was not disturbance to doubling so still intact,but soon it will be broken.
6.) Laxmipur borang, Shivnarayanpur and Kahalgaon has now new long and wide Fob and Svrp is getting a new long platform, construction is under progress.
7.) There is caution before lailakh and train moves at as slow as 10-15kmph for 8-10 min before lailakh mamalka station.So Bgp to Clg takes 45 min to cover 30 km distance.
8.) Between lailakh mamlka to Ekchari even ground work for doubling not completed and one bridge before and after Ekchari at night I missed glimpses but they are far away from completion and this section of 10 km where work is @0% just beginning will get completed and commissioned around 2020 as during monsoon the work will be disrupted as it comes in flood prone area.
9.) Bharawa to Bonidanga Link Cabin holes has been been cemented and few poles has been also kept but not fixed yet this part of electrification comes under Pakur Malda Electrification whose progress is too slow even when that is Ghy Hwh main line and lot of reputed train run through this route.It cant be completed in 2018 no wires all the way even poles not fixed everywhere.
please wait...Translate to English
please wait...Translate to Hindi
Bro Aapne bahut saari informations de di.
But looking as if you are typing in a hurry to upload the blog quickly due to mobile signal availability problem in train. It would have been better if you should have typed 1. 2.3. so on.... point wise along with pictures uploading
why not clicked pictures bro?????
But looking as if you are typing in a hurry to upload the blog quickly due to mobile signal availability problem in train. It would have been better if you should have typed 1. 2.3. so on.... point wise along with pictures uploading
why not clicked pictures bro?????
please wait...Translate to English
please wait...Translate to Hindi
1 Public Posts - Sun May 06, 2018
3 Public Posts - Mon May 07, 2018
3 Public Posts - Tue May 08, 2018