Vivek Express: ऊंचे नीचे रास्ते और मंज़िल तेरी दूर.

Search Forum
<<prev entry    next entry>>
Blog Entry# 3674666
Posted: Jul 31 2018 (19:35)

7 Responses
Last Response: Aug 02 2018 (19:39)
Rail Fanning
31856 views
21

★★★
Jul 31 2018 (19:35)   51464/Belagavi - Miraj Passenger (UnReserved) | KUD/Kudachi (2 PFs) | PUNE/WDM-3A/16012
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Entry# 3674666            Tags   Past Edits
This little town's station will assume significance in the future when it will become the junction for the line towards Jamakhandi and onwards to Bagalkot.
Just the lonely short PF for the mainline. The loopline is used by the crossing train and the passengers have to make do with it.
Hopefully doubling will get it a new PF.
Translate to English
Translate to Hindi

3 Posts

16271 views
1

Aug 02 2018 (19:29)
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Re# 3674666-4              
No.
Translate to English
Translate to Hindi

16110 views
1

Aug 02 2018 (19:30)
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Re# 3674666-5              
No. Very less, must be just replacement sleepers.
No work is going on.
Translate to English
Translate to Hindi

22280 views
5

Aug 02 2018 (19:34)
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Re# 3674666-6              
The poles were short and also had some board placed on them. Not electrification poles I think.
Translate to English
Translate to Hindi

23247 views
8

Aug 02 2018 (19:38)
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Re# 3674666-7              
Already work of land levelling is done. The RoB is pretty wide, so on one side 2 tracks are there and the other side levelling for 2 more is done. Don't understand why, because, the loopline that the passenger is entering will become the 2nd mainline when doubling is done, so why the need for more I didn't understand. Maybe pretty long looplines for the freights. And they will join the mainline after the RoB.
Translate to English
Translate to Hindi

16699 views
1

Aug 02 2018 (19:39)
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Re# 3674666-8              
The above reply was for you.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy