Search Forum
Blog Entry# 3717151
Posted: Aug 16 2018 (09:12)
128 Responses
Last Response: Aug 17 2018 (13:53)
128 Responses
Last Response: Aug 17 2018 (13:53)
132 Posts
Not extra.
There was some technical problem in S-7 while it was going NDLS at DDU. so S-7 was detached at DDU and ECR S7 was attached to back side of the train that day.
There was some technical problem in S-7 while it was going NDLS at DDU. so S-7 was detached at DDU and ECR S7 was attached to back side of the train that day.