18 th extension day, extended on 28 Oct 2001 from BKSC to RNC
Then EC 0 (subsequently 1), CC 5 (subsequently changed to 6), EOG 2.
On temporary basis not to make it earlier than schedule before extension, its schedule for a shortwhile: HWH 0645, RNC: 1330. RNC 1400 HWH 2115. Original extended shedule was applicable after end of temporary schedule. The original was:
2019:...
more...
Then EC 0 (subsequently 1), CC 5 (subsequently changed to 6), EOG 2.
On temporary basis not to make it earlier than schedule before extension, its schedule for a shortwhile: HWH 0645, RNC: 1330. RNC 1400 HWH 2115. Original extended shedule was applicable after end of temporary schedule. The original was:
2019:...
more...
What the hell, so over the time it has become slower. Lol for Mission Raftaar
Its initial schedule immediately after extension on stopgap basis was not to make it earlier than schedule before extension between HWH GMO for 2019 direction because maybe Railways needed time to make passengers aware about new schedule otherwise they would miss train if its schedule become earlier and for 2020 direction mostprobably that schedule was for rake link availability. I don't know if that schedule was applicable until the last day upto which ticket was booked just before showing new schedule on ticket or online booking screen. Maintaining punctuality may be tough then so it was for a shortwhile. But HWH DHN in 2 hrs 51 min when it was rescheduled to 0615 from 0605 at HWH though in next year TT it was 0605 again.