@ Can we update Gadag- hotgi as Doubling and electrification in IRI?
55 Posts
To run Eloco their shoud be proper arrangements at SUR so it will be done once Gulbarga-Bhigwan get electrified until that railways cant run Eloco just between Hubli-Hotgi. Entrie route should get electrified to run Eloco and i hope Gulbarga-Bhigwan get Electrified soon and later GDG-Hotgi get electrified.But Eloco can be seen on UBL-GTL section soon compared to GDG-HG route.
Chikkajajur -Tumkur almost doubled section only except some 30kms it seems. Entrie route should get doubled to change TT. From Tumkuru to Bijapur via ASK-UBL-GDG-BGK entire route doubled means then they think of speed up. Now also train arrives UBL before time so what is use it will be made to stand at UBL or at GDG with single sections and crossings
I came to Bijapur last saturday. Saw track laying work is going super fast near bijapur. Hope they will complete doubling on time. As you said speed of the train has improved slightly.
yes SWR planned to Commission Minchinal-Wandal by this Feb end so for that reason works going on in fast mode. I hope after complete doubling trains can be allowed to run at more speed and also need Loop lines upgradation for speed of 30kmph from 15kmph presently like how they are doing for YPR-UBL and BAY-HPT section now a days.
Prem do you have any idea during doubling some tracks are constructed at left of existing track and some are at right?