Search Forum
Blog Entry# 4310690
Posted: May 06 2019 (21:35)
8 Responses
Last Response: May 07 2019 (10:56)
8 Responses
Last Response: May 07 2019 (10:56)
Other News
SWR/South Western
SteelCityRF^~ 3184 news posts
I. Out of three rakes, one rake of Train No. 16593 / 16594 KSR Bengaluru – Hazur Sahib Nanded – KSR Bengaluru Express will be provided...
3 Posts
Same thing happened with 12295/12296 gradually all rakes got LHBIFIED
That means by 29-June, SWR will be ready with all 3 rakes of LHB and hence will become permanent.
Okay. I just asked bcoz specific dates were mentioned till a specific date.
Mostly they meant like this, Only on above specified dates this train will run with LHB rake whereas on other days this train will run with ICF rake as this train runs on daily basis and has 3 rakes but only one rake is converted into LHB