Jun 26 2019 (22:58) 12510/Guwahati - SMVT Bengaluru SF Express | NJP/New Jalpaiguri Junction (8 PFs)
rajivmetal~
rajivmetal~ 703 blog posts1. Based on Journey on 31st Ma 2019 I have seen Upto Mangurjan (MXJ) wiring done and wire installation machine was in the station also.
2.After that some discreet place wiring has done. But most of the OHE pole erection work has been done already.
3. In NJP station platform 2,3 and 1 A i have seen some OHE pole. but wiring work has not been observed.
2.After that some discreet place wiring has done. But most of the OHE pole erection work has been done already.
3. In NJP station platform 2,3 and 1 A i have seen some OHE pole. but wiring work has not been observed.
According to video Aluabari-Baghdogra-Sguj is also under electrification.