Search Forum
Blog Entry# 4388160
Posted: Jul 26 2019 (08:34)
7 Responses
Last Response: Jul 27 2019 (16:51)
7 Responses
Last Response: Jul 27 2019 (16:51)
Jul 26 2019 (08:34) 56529/Harihar - Hosapete Passenger (UnReserved) | HPT/Hosapete Junction (Hospet) (3 PFs)
DeepakUlli~
DeepakUlli~ 2929 blog postsHRR -kty passenger train will be extended to Hosapete by September 15 th and all work will be completed by August 15th after that CRS inspection will conducted: SWR GM ...
3 Posts
they can add 4 coaches more only ..is there is problem at HB halli station ..it got struck btn 2 LCs gate, one LC must be made RUB..due to this run more coaches train in this line cant be added.
Yah I think due to MG era the HB halli is small. But I think One LC must be closed to accommodate more coaches. And also Platform length should be extended.
Atlast harihar to hosapete line will be fully operational after decades long wait
It would be great if they can extend the present HRR-YPR ICE to HPT and make it daily with change in timings.
Good news.
We need a dedicated train daily from Bengaluru to Hosepete
We need a dedicated train daily from Bengaluru to Hosepete