Work of Electrification in Nadikude - Macherla section of Guntur division of SCR is complete. Light engine trial to be conducted on 05.08.19.
After successful light engine trial CRS inspection will be done before opening section for electric traction.
click here
After successful light engine trial CRS inspection will be done before opening section for electric traction.
click here
Wow good news am eagerly waiting to see electric traction on this route.
So now I understood ICF EMU rakes which were parked at Ammanabrolu railway station and Chirala railway station are to replace this 57317,57323,77297 three trains.
So now I understood ICF EMU rakes which were parked at Ammanabrolu railway station and Chirala railway station are to replace this 57317,57323,77297 three trains.
CRS inspection of 33 RKM of Nadikude-Machrela section of Guntur division is planned on 04.09.19.