Search Forum
Blog Entry# 4420414
Posted: Sep 06 2019 (22:37)
6 Responses
Last Response: Sep 07 2019 (06:11)
6 Responses
Last Response: Sep 07 2019 (06:11)
Sep 06 2019 (22:37) 12744/Vikramasimhapuri Amaravati Intercity Express | BZA/Vijayawada Junction (10 PFs)
avinashttglrh~
avinashttglrh~ 605 blog postsExcluding premium trains like Duronto, Rajdhani and Shatabdi, this is the fastest train of SCR \m/
LPI Intercity need to catchup.
LPI Intercity need to catchup.
1 Posts
lpi intercity generates revenue to IR. from past 2 days this train is running empty, if this continues it is going to be a disaster. better this gets extended to tpty so it generates revenue to IR. it doesn't matter if it is faster by 5km/hr, it has to generate revenue.
It was just introduced and occupancy will definitely increase as there are no trains to Vja in that time zone. It at all they extend they should do with increased coaches to 18 and not disturbing the timings between Gudur and VIJAYAWADA
Thats true...but technically speaking :D
Its a little slower than Kerala, that departs 25 min earlier.
Its a little slower than Kerala, that departs 25 min earlier.
It'll do...initially started with three 2s coaches and now increased to 4 coaches. It will take time to gain popularity, Article from twitter SCR. click here