Search Forum
Blog Entry# 4439794
Posted: Sep 27 2019 (11:25)
17 Responses
Last Response: Sep 27 2019 (14:07)
17 Responses
Last Response: Sep 27 2019 (14:07)
Sep 27 2019 (11:25) 22701/Visakhapatnam - Guntur UDAY Express
venkat_vskp~
venkat_vskp~ 6469 blog postsDid Duvvada - Vijayawada in just 4 hr 39 min. Reached EE also on time and took 1 hrs from there. As said earlier its a tiny rake can do much faster than present timings. Hope SCR increases speed to attract more passengers.
13 Posts
It did in 3 hrs 40 min. May be 3 hrs 30 min possible. EE - BZA should be done in 45-50 min.
Haha good for connectivity. Ina ee rouju 5 hr 10 min vellindi NTES prakaram.
Ade traveler prakaram 5 hr 2 min lo. So 5 hrs lo kottesyyochhu. Full AC train ki ass preference vundaali
Ade traveler prakaram 5 hr 2 min lo. So 5 hrs lo kottesyyochhu. Full AC train ki ass preference vundaali
it can be speeded by 15min,starting at 5:30 from vskp,5:30am is not "so early",its the right time for coastal area ppl to wake up