Search Forum
Blog Entry# 4503446
Posted: Dec 02 2019 (17:56)
3 Responses
Last Response: Dec 02 2019 (19:20)
3 Responses
Last Response: Dec 02 2019 (19:20)
Commentary/Human Interest
NFR/Northeast Frontier
~ 405 news posts
पांच सितारा होटल के कमरों की तरह अब रेलवे फर्स्ट एसी की भीतरी डिजाइन को संवारेगा।
...
...
Should copy and paste the whole article so that clicking on link is not required.
Zone tagged should be NR and category should be new facilities/technology
Zone tagged should be NR and category should be new facilities/technology
Similarly design of rly track/bridges too should be upgraded to:
increase train speeds,
reduce journey times
improve ride quality
incorporate safety
increase train speeds,
reduce journey times
improve ride quality
incorporate safety
Presently their main focus is giving "Great travelling experience". All things you mentioned are time consuming and many times expensive than cosmetics of coaches. If they are planning to increase speed of 2 of the busiest routes from 130 to 160, and it is going to take 4 years (minimum), IMHO they should aim for 200 and start working on that. Of that Delhi-Kolkata route is mostly flat and straight while Mumbai route has some steep inclines between Kota-RTM but otherwise flat and straight. Under station development, they should build waiting halls on an upper deck and with multiple exits connecting to at least 2 FOBs so that whenever passengers know which platform their train is arriving, they get there easily.