Search Forum
Blog Entry# 4530607
Posted: Jan 03 2020 (16:02)
No Responses Yet
No Responses Yet
Jan 03 2020 (16:02) Udyan Express (PT)/11301 Train - News
Its so boring out here in IRI
_V_K_^~ 46976 Conf TLs 225 Void TLsNews Entry# 0
▪️3rd rake will be converted into LHB from 04.01.20
▪️3rd rake will be converted into LHB from 04.01.20
News Entry# 0
The first rake will have one First AC, three AC-2 Tier, three AC-3 Tier, 11 Sleeper Class, 2 general second class and 2 generator vans for the following period.
11301 Udyan Express from Mumbai on and from 24.11.2019 to 5.1.2020
11302 Udyan Express from KSR Bengaluru on and from 25.11.2019 to 4.1.2020
12116 Siddheshwar Express from Solapur on and from 23.11.2019 to 2.1.2020
12115 Siddheshwar Express from Mumbai on and from 26.11.2019 to 1.1.2020
The composition of first rake of these trains will be one First AC, three AC-2 Tier, three AC-3 Tier, 10 Sleeper Class, 3 general second class and 2 generator vans on permanent basis from the dates mentioned against each.
11301 Udyan Express from Mumbai on and from 4.1.2020
11302 Udyan Express from KSR Bengaluru on and from 5.1.2020
12116 Siddheshwar Express from Solapur on and from 3.1.2020
12115 Siddheshwar Express from Mumbai on and from 6.1.2020