Search Forum
Blog Entry# 4546245
Posted: Jan 22 2020 (19:23)
6 Responses
Last Response: Feb 25 2021 (23:25)
6 Responses
Last Response: Feb 25 2021 (23:25)
Jan 22 2020 (19:23) IMG96211-135981/♥♥Bangalore Mumbai Duronto♥♥
2252 net green flags 2 green per TrainCustom Ratings
Tom_Lee_Cooper~
Tom_Lee_Cooper~ 2050 img trains 106 popular2252 net green flags 2 green per TrainCustom Ratings
A must needed faster Bangalore Mumbai connection
The train will easily cover the timetable once the doubling works are over
The train will easily cover the timetable once the doubling works are over
1 Posts
Duranto is not feasible bcoz of major single track between Kalburgi and Pune Jn
Stoppages of just 2 minutes after very long runs may not ne enough. longer stoppage may be given at specific station(s) instead of just 2 minutes to facilitate change of staff/ water filling .
agree sir
it will be in the operational TT,
only for the city stoppages have given 5 mn halt
it will be in the operational TT,
only for the city stoppages have given 5 mn halt