02622 ,again had good run in JHS Bhopal section .Jhs to Nishatpura.289km in 3hours 18minutes on par with other Superfast trains (;130 cleared trains )
Hope SR implement better TT in NDLs --BPl-NDLS soon .
too much slack at present .
02622 ,again had good run in JHS Bhopal section .Jhs to Nishatpura.289km in 3hours 18minutes on par with other Superfast trains (;130 cleared trains )
Hope SR implement better TT in NDLs --BPl-NDLS soon .
too much slack at present .
13 Public Posts - Sat Dec 26, 2020
The only way to do that is to let TN pass through loop near PF1-1 the way duronto used to OT TN, i think it has to do with the way points are setup near BPL, all north to south trains can only be routed through Pf-1 and loop.