CRS Inspection of Sonamukhi- Masagram section completed successfully today. With this section of
77 km Electrified successfully Adra div. achieves 100% Electrification through it's entire network.
77 km Electrified successfully Adra div. achieves 100% Electrification through it's entire network.
2 Posts
Only the last job of track joining at MSAE is left and then BQA finally gets a 41 km shorter route to Kolkata.😊