Finally one of the most awaited doubling project in SER gains momentum.
The Bhojudih Talgoria Doubling. ( 12.20 KM ) in connection with permanent diversion of the fire affected Dhanbad - Chandrapura Road .
SER...
more...
The Bhojudih Talgoria Doubling. ( 12.20 KM ) in connection with permanent diversion of the fire affected Dhanbad - Chandrapura Road .
SER...
more...
48 Posts
CRP bypass included in CRP-MHQ-TLE doubling. Railway line in GMO-Bandidih, KDS-KTH-PLJE & MHQ-LYD-VAA sections falls in danger zone, see my pic attached. Railway lines in GMO-CRP, VAA-BJE, CRP-MHQ-TLE, PKA-PEH & DHN-KDS-TET sections are safe for train operation. very slow movement of freight trains allowed in GMO-Bandidih, KDS-KTH-PLJE & MHQ-LYD-VAA sections. Regarding others, GMO-CRP section has 120 kph MPS; CRP-MHQ-TLE section has 110 kph MPS; VAA-BJE, PKA-PEH & DHN-KDS-TET sections have 100 kph MPS.