Search Forum
Blog Entry# 5025621
Posted: Jul 27 2021 (09:55)
4 Responses
Last Response: Jul 27 2021 (10:12)
4 Responses
Last Response: Jul 27 2021 (10:12)
Bhusaval, Wardha, Varangaon and Akola #SB pics. The AK-SVW line is electrified and works going on Akola unelectrified platforms. The WAG7 xinged us at BD
1 Posts
Only saw electrified route, which crosses over NGP-BSL line at Akola outer