Search Forum
Blog Entry# 5041966
Posted: Aug 15 2021 (09:26)
36 Responses
Last Response: Aug 15 2021 (14:48)
36 Responses
Last Response: Aug 15 2021 (14:48)
75 Vande Bharat trains will connect every corner of India in 75 weeks of Amrit Mahotsav of Independence: PM Modi
33 Posts
Yes, but if demand is for daily or more than 2-3 days then there comes an Issue for RSA
Bad idea, the train will fail miserably. Many cheaper options available between Jabalpur and Bhopal.
For a Vande Bharat to be successful in Madhya Pradesh, either Jabalpur- Bhopal- Indore (8 hour running time Maximum) or Jabalpur-Bhopal Gwalior has to be connected.
Also if a Vande Bharat starts from Jabalpur in the morning, then Habibganj Jan Shatabdi needs to be extended beyond Jabalpur- either Singrauli, Balaghat or Rewa (whichever route is capable of holding 1 day return trip).
As...
more...
For a Vande Bharat to be successful in Madhya Pradesh, either Jabalpur- Bhopal- Indore (8 hour running time Maximum) or Jabalpur-Bhopal Gwalior has to be connected.
Also if a Vande Bharat starts from Jabalpur in the morning, then Habibganj Jan Shatabdi needs to be extended beyond Jabalpur- either Singrauli, Balaghat or Rewa (whichever route is capable of holding 1 day return trip).
As...
more...
Ya fir train 18 ka naam badalkar 75 Vande Bharat kar do. Lo ji chal gayi 75 Vande Bharat😁😁😁😁😁