Is there any concrete proposal from SER aka Adra divn to ER/hwh divn for inter connect at Msae & Gmmg.
Since Rail over Rail is an distant dream, limited no of train access with provision of interlocking should be given a priority.
TAK-VSU is on jeopardy as land acquisition in WB is not possible. SER must go all out for this project.
Due...
more...
Since Rail over Rail is an distant dream, limited no of train access with provision of interlocking should be given a priority.
TAK-VSU is on jeopardy as land acquisition in WB is not possible. SER must go all out for this project.
Due...
more...
5 Public Posts - Sat Sep 18, 2021
Yes that's planned. Even both the DRMs have visited the site to review the west end connection location. Unless the HBC 4th line alignment is approved, the connection with MSAE-BQA cannot be made.😓