Search Forum
Blog Entry# 5095332
Posted: Oct 14 2021 (23:12)
1 Responses
Last Response: Oct 16 2021 (10:28)
1 Responses
Last Response: Oct 16 2021 (10:28)
Oct 16 2021 (10:30) Saraighat SF Special (PT)/02346 Train - Rake Sharing Arrangement
appjp
SGUJ_20011^~ 7862 Conf TLs 70 Void TLsTwo dedicated rakes. PM @HWH .
Past Edits
Updated: Oct 14 2021 (23:12) by SGUJ_20011^~
Two dedicated rakes. PM @HWH . SM @GHY
Two dedicated rakes.
This train does not require Secondary maintainance. U must note, SM is required at other end only when train is travelling more than 96 hrs or 3500 kms (whichever earlier) in a round trip. If Not, then RTBPC (round trip brake power certificate) is issued with PM (like in case of this train)