Search Forum
Blog Entry# 5157819
Posted: Dec 08 2021 (21:15)
13 Responses
Last Response: Dec 09 2021 (21:20)
13 Responses
Last Response: Dec 09 2021 (21:20)
SER's 1st centralised monitering and signallling system trial being conducted at new Control Room Adra.
This system will give Real time Information of train movement in yard which will improve Frequency & Punctuality of train movement & also pass safety.
New EI cum Control Centre Adra to manage traffic in the following sections in the division in phased manner:
1. ADRA+JOC-BURN/MOH.
2....
more...
This system will give Real time Information of train movement in yard which will improve Frequency & Punctuality of train movement & also pass safety.
New EI cum Control Centre Adra to manage traffic in the following sections in the division in phased manner:
1. ADRA+JOC-BURN/MOH.
2....
more...
9 Posts
Shiromani er Radhamohanpur, haur, balichak, bagnan ar BQA ADRA er moddhye 2-3 te halt withdraw hobe.
KGP ADRA 's MEMU Dep 5pm slot is fixed, To be approved by ADRA Div.
Yes reverting the old timing. New timing was disaster for Purulia Express.
Ami sunchi HWH ADRA Shiromani MEMU Rake cholbe ar HWH GTS MEMU er sathe RSA hobeo eta sunchi, janina kotota thik.