Shri Pradeep Kumar conducted a window trailing inspection of the Sambalpur-Titlagarh section. Took stock of various safety aspects at Bridges, Level Crossings & stations.
Is this section fully doubled ? Which is the pending section between SBP-VSKP where doubling has still not happened ?
Whenever demand is there Ecor gives reason for saturation/single line etc. Hopefully once doubling is complete this should stop