The work of third line between Virangana lakshmibai (Jhansi) - Gwalior section is going on at a fast pace in Anant Paith
Great.. what's the timelines to complete Dabra-Anant Peth patch ?
Are third line works going on in the entire stretch or in patches?
Yes, the work of third line is going on in the entire stretch. But at some places the work is incomplete, like the work of the bridge over the Sindh river is incomplete and the work is going on a little slow somewhere between Antri to Gwalior.