Search Forum
Blog Entry# 522789
Posted: Sep 09 2012 (01:51)
9 Responses
Last Response: Sep 10 2012 (00:34)
9 Responses
Last Response: Sep 10 2012 (00:34)
as per IR availability status da removal of 1 SLR+3 SL(s8-s7-s6)+1UR at KIR seems incorrect.........pls vrfy and Update if required...
5 Posts
that means 463 cant be booked from end to end??????
another info....SDAH-MLTD 471 berth avlble
bt 4 Kalka mail avlblty from HWH-CDG and HWH-KLK diffr hugely bcoz of removal of da coaches at CDG.......
another info....SDAH-MLTD 471 berth avlble
bt 4 Kalka mail avlblty from HWH-CDG and HWH-KLK diffr hugely bcoz of removal of da coaches at CDG.......
Assuming all the 471 berths get booked for SDAH-MLTD, there would still be (471-463)=8 berths for booking between MLTD-SHC or any station enroute.
##
One cannot generalize the quota system of one train with another. Kalka ail do have the same quota throughout.
##
One cannot generalize the quota system of one train with another. Kalka ail do have the same quota throughout.
Assuming the information given by you at /blog/post/522789/2 is correct, Yes!