Search Forum
Blog Entry# 5263378
Posted: Apr 02 2022 (10:42)
6 Responses
Last Response: Apr 07 2022 (09:35)
6 Responses
Last Response: Apr 07 2022 (09:35)
Year 2021-22 Achievements ...
.
Record #electrification of 6,366 RKMs has been achieved in IR history during 2021-22. Previous highest electrification was 6,015 RKM during 2020-21.
As on 31.03.2022, out of 65,141 RKM of BG network of IR (including KRCL), 52,247 BG RKM has been electrified, which is 80.20% of the total BG network.
...
more...
.
Record #electrification of 6,366 RKMs has been achieved in IR history during 2021-22. Previous highest electrification was 6,015 RKM during 2020-21.
As on 31.03.2022, out of 65,141 RKM of BG network of IR (including KRCL), 52,247 BG RKM has been electrified, which is 80.20% of the total BG network.
...
more...
1 Posts
Electrification of 664 RKM has been done on Western Railway during the current
financial year 2021-22.
#WR now has 3784 RKM of electrified BG route, which is 75.42% of total BG route of 5017 RKM
financial year 2021-22.
#WR now has 3784 RKM of electrified BG route, which is 75.42% of total BG route of 5017 RKM
#SWR has achieved electrification of 511.7 route km by 28th March 2022. The Railway Board had set a target of 459 route km for the financial year 2021-22.