I request admin to Please change Single electric line to construction of electric line as RUPC is not electrified just goods yard one track wiring has been done but on stations there are no sign of electrification. Don't know how this division has done the loco and crs trial from RMU to LKU as one station has to be electrified yet on this section.
In that case RUPC LKU has to be kept as Single line electrification.
Only at RUPC station the electrification work has not been done rest all the station are completed with wiring
Then Chatarpur Bilaspur Road sec Can be changed to electrification.