New Facilities/Technology
NR/Northern
PrakharYadav^~ 1464 news posts
कानपुर-लखनऊ रेल मार्ग के उच्चीकरण की समय सीमा तय कर दी गई है। सब कुछ पटरी पर रहा तो 21 महीने बाद स्वर्ण शताब्दी से कानपुर...
1 Posts
sometimes, it does even take more.
.
actually, NDLS HWH k mission raftaar mei cnb-lko bhi include kia gya hai. hence speed upgradation is planning (although planning hi chal rhi hai)
.
Quadrupling of CNB-LKO...
more...
.
actually, NDLS HWH k mission raftaar mei cnb-lko bhi include kia gya hai. hence speed upgradation is planning (although planning hi chal rhi hai)
.
Quadrupling of CNB-LKO...
more...
Distance 90 se kam
aur speed 45 se kam
Matlab poore 2 ghante se jyada.
aur speed 45 se kam
Matlab poore 2 ghante se jyada.
this section i.e. LKO CNB has been ignored for no reason.
.
upgrading it well in time wud have beneficial for both IR and passengers.
.
upgrading it well in time wud have beneficial for both IR and passengers.
similar to multiple metro cities in South, North too requires multiple cities to meet the demand and grow too. CNB LKO sud have been planned dat way.
.
dere have been multiple times where CNB LKO is proposed to have RRTS. but prior to that they need good Railways and Roadways (current NH is dilapidated and NE-6 is still to start with construction).
....
more...
.
dere have been multiple times where CNB LKO is proposed to have RRTS. but prior to that they need good Railways and Roadways (current NH is dilapidated and NE-6 is still to start with construction).
....
more...