LOTS OF TENDER WORKS FOR SER:
Consultancy services for detailed project report and detailed design consultancy in connection with execution of work for preliminary works such as final location survey, soil investigation works, preparation yard plans, slope stability analysis and submission of various detailed design & drawings between
(i) dangaoposi-jaroli 3rd line (44.10 km),
(ii) gamaharia-chandil 3rd line (25.50 km),
(iii)...
more...
Consultancy services for detailed project report and detailed design consultancy in connection with execution of work for preliminary works such as final location survey, soil investigation works, preparation yard plans, slope stability analysis and submission of various detailed design & drawings between
(i) dangaoposi-jaroli 3rd line (44.10 km),
(ii) gamaharia-chandil 3rd line (25.50 km),
(iii)...
more...
If all these projects happen then speed of trains in SER will increase many times.
That's fine... But why two different tenders for ADTP-RKSN 4th and TATA-ROU 4th lines..!!
And how long it usually takes to start these works on ground after the survey??
And how long it usually takes to start these works on ground after the survey??
I have no idea. Anyone else can say something is these project approved and how long it will take to start work on these ?