Search Forum
Blog Entry# 5499716
Posted: Oct 03 2022 (09:40)
108 Responses
Last Response: Oct 04 2022 (14:50)
108 Responses
Last Response: Oct 04 2022 (14:50)
Oct 03 2022 (09:40) 20901/Mumbai Central - Gandhinagar Capital Vande Bharat Express
TouristerDivyanshu^~
TouristerDivyanshu^~ 174376 blog postsWhen Politics ruined trains..
WR should take training in NCR to know how to run trains at high speed with high avg
.
12560 has 75 avg with 2 stops, a major slow skip bridge, few kms of single stretch, mps of 110 for 120 kms
Still...
more...
WR should take training in NCR to know how to run trains at high speed with high avg
.
12560 has 75 avg with 2 stops, a major slow skip bridge, few kms of single stretch, mps of 110 for 120 kms
Still...
more...
15 Public Posts - Mon Oct 03, 2022
Develop a third line from Mumbai Central to ADI and time improvement will happen.
Fencing of railway lines is needed along with the construction of walk-able bridges over the WR part, near suburban Mumbai.
Fencing of railway lines is needed along with the construction of walk-able bridges over the WR part, near suburban Mumbai.
89 Public Posts - Mon Oct 03, 2022
3 Public Posts - Tue Oct 04, 2022