Search Forum
Blog Entry# 5518830
Posted: Oct 19 2022 (20:51)
No Responses Yet
No Responses Yet
On the newly constructed third line on the Dabra-Antri rail section between Mathura and Jhansi, after successful testing of track quality, riding quality, etc., after conducting speed trials, permission has been given to operate at a speed of 100 kmph. With the introduction of this rail line, smooth operation of trains and time will be saved.