Search Forum
Blog Entry# 5538317
Posted: Nov 07 2022 (18:44)
2 Responses
Last Response: Nov 08 2022 (07:25)
2 Responses
Last Response: Nov 08 2022 (07:25)
Nov 07 2022 (18:44) 20608/Mysuru - MGR Chennai Central Vande Bharat Express
Railfan_SRDiv^~
Railfan_SRDiv^~ 2541 blog postsBiggest time consume at this point for any train is Mosur track change near Arakkonam. Railways should plan in such a way that main line (express/SF line) join with Platform 1 and 2 at Arakkonam so that train dont need to slow its speed before Arakkonam. They need to plan Arakkonam like VAPI station in Mumbai. Suburban track line should connect to 1A and 6
I think Arakkonam station is skipped at 60+KMPH for non-stopping trains. Thanks.
Yes after entering the station, sure. But Track change in Manavur still takes time. Thats a problem . They should make in such a way it continues in track 3 join at AJJ pF1 in straight track to go to KPD.