Search Forum
Blog Entry# 5621414
Posted: Feb 04 2023 (18:26)
23 Responses
Last Response: Feb 05 2023 (04:26)
23 Responses
Last Response: Feb 05 2023 (04:26)
Feb 04 2023 (18:26) 20834/Secunderabad - Visakhapatnam Vande Bharat Express | KZJ/Kazipet Junction (3 PFs)
RailwayFiles~
RailwayFiles~ 265 blog postsRescheduled by 3 hrs, departed SC at 6:13 PM, gonna be interesting, Godavari is 20 kms ahead, and few will join the line ahead near Kazipet. Biggies like Godavari, Kerala will be sidelined to make way for this youngest premium train.
19 Posts
Falco departed TDD and VB is just trailing. I guess it will be looped at NDD. Next 12375 after RJY. No other competition.
Crossed Falaknuma at Navabpalem. Cruising like anything. I expect this train to reach VSKP by 2AM if it gets fantastic clearance.
Yeah turnaround is taking 10-15 minutes and entering BZA is taking atleast 20 minutes or more from Rayanapad. Overall its taking 40 minutes on avg in BZA premises. To cross WL and KZJ it is taking 15-20 mts or more sometimes, totally 50-55 minutes in these places, this must be reduced. And i donno about RJY, there also it might be loosing time.
12375 and 17480 on the line, still far though but will be looped before Duvvada.
Same case in RJY towards Vja pulls out @15kmph which is the PSR then slowly pickup speed 20 then 30kmph when it reaches parallel road bridge point and at bridge entrance 60kmph. Same Rjy entrance before 1km @15kmph starts stoopage 5+mins. So on RJY area 12-14mins with speeds less then 60kmph for 3-4km.