DRM/TSK along with ADRM & Branch Officers inspected the existing infrastructure,amenities and safety installations of stations in New Tinsukia-Furkating,Mariani-Golaghat & Dibrugarh-Simaluguri sections. Staff dealing with train operation,safety was sensitized during the occasion.
Source: DRM TSK Twitter Handle
Source: DRM TSK Twitter Handle
2 Posts
2 questions:-
1. Is it completely electrified???
2. Is it capable of holding VBs in the future if any trains get inaugurated in that section???
1. Is it completely electrified???
2. Is it capable of holding VBs in the future if any trains get inaugurated in that section???
The Wild Bushes Which were Grown In the Shed Premises Because of Abandoning From 2017 is Now Being Cleared and The Shed is Used as Store For Electrification Equipment and Upgradation Is Expected as Only Electrification Equipment Are to be Installed other all Shed Works are Complete bow Furkating to Mariani OHE Civil Work is Complete.
VB Inauguration in This Route Is nor possible Because of Terrain and First Shatabdi Train Was Introduced now it's Cancelled how Will they Introduce VB
VB Inauguration in This Route Is nor possible Because of Terrain and First Shatabdi Train Was Introduced now it's Cancelled how Will they Introduce VB
Oh ok.... that's some good information.... and well for VB I was not sure and that's why just wanted to find out...👍👍👍
Firstly 12085/86 DBRG Shatabdi was Introduced And later Cancelled should be Back as Doubling is Also Sanctioned and VB Here is Not Possible I Think so
Let's wait and see in the future... who knows anything can happen anywhere anytime....👍👍👍