Search Forum
Blog Entry# 5757335
Posted: Jun 21 2023 (19:38)
3 Responses
Last Response: Jun 22 2023 (13:07)
3 Responses
Last Response: Jun 22 2023 (13:07)
A New Highway flyover has been built and fully operational now which is just 900 mts. away to the East of Bagribari (BGBI) railway station and consequently the Level crossing has been removed for smooth operation of trains.
Earlier it was a restricted block section from BGBI - BLPA under ALMG - BLPA section.
The details has been attached hereinwith:-
👈👈...
more...
Earlier it was a restricted block section from BGBI - BLPA under ALMG - BLPA section.
The details has been attached hereinwith:-
👈👈...
more...
Respected RF's
plz do the needful if the MPS of this section is required to be changed or speeded up.
plz do the needful if the MPS of this section is required to be changed or speeded up.
2 Public Posts - Thu Jun 22, 2023