Search Forum
Blog Entry# 5788039
Posted: Aug 01 2023 (09:42)
21 Responses
Last Response: Aug 23 2023 (12:14)
21 Responses
Last Response: Aug 23 2023 (12:14)
Aug 01 2023 (09:42) 17603/Kacheguda - Yelahanka Express (PT) | GTL/Guntakal Junction (7 PFs)
VinodArvind~
VinodArvind~ 3429 blog posts🔶 Change of working pattern and coach position.
n view of Newly Commissioned Bypass line with Twin Single line between GTL-MLGT, following are the changes in
🔸working pattern of Express Trains and
🔸 traction:
n view of Newly Commissioned Bypass line with Twin Single line between GTL-MLGT, following are the changes in
🔸working pattern of Express Trains and
🔸 traction:
21 Posts
Due to Loco reversal problem only at the peak hours they are bypassing GTL Jn there is no bus lobby or someother reason.GTL has well connected with Bellary.GTL is the biggest junction in terms of revenue from passengers as well as freight trains...Mainly SWR not allowing some additional trains or new destinations via Bellary they are only preferring only Hubli,Belgavi,Miraj,Dharwad.They are focusing target only freight trains in bellary-hospet-Guntakal section.
I don't think trains will bypass GTL. Freight trains will be bypassed. 18047-48 skipping bypass is not possible due to slip coaches and even SLR coaches used to be detached here
Who told you that VB is not introduced because of Guntakal bypass? The Guntakal bypass is proposed in 2016-17
Bro they proposed this in 2016/17 but they completed in Aug 2023. Actually they should introduce this VB before SC TPTY VB. But they postponed. Railways completed this bypass very fastly. After completing this bypass they introduced KCG SBC VB. So thought this VB runs via Guntakal bypass.
Is there any pltform change happened after this byepass commissioned for 12975/76?