Search Forum
Blog Entry# 5804817
Posted: Aug 24 2023 (00:32)
2 Responses
Last Response: Aug 24 2023 (09:09)
2 Responses
Last Response: Aug 24 2023 (09:09)
Patalkot Express jbse isko LHB rake diya hain or extension hua hain tbse kabhi Right time nahi rehti hain
Yeh छिंदवाड़ा tak thi ICF coach k sath mostly right time chalti thi Lakin ab iski kahani bhi shridham jaise ho gyi hain hamesha delayed or rescheduled rehna
Yeh छिंदवाड़ा tak thi ICF coach k sath mostly right time chalti thi Lakin ab iski kahani bhi shridham jaise ho gyi hain hamesha delayed or rescheduled rehna
Extension ke baad TAT(Turn Around Time) hi khatam ho gya hai.Ya to extension cancel ho ya new rake ki jarurat hai uske bina aise hi rahega iska
One easy way could be to have ICF coaches
ready in advance so that there are a total of 6 dedicated trains, 3 LHB and 3 ICF trains. This way, there will be enough time for maintenance and bookings can be scheduled based on the train type for each day. Else it will create lot of problems in winter.
ready in advance so that there are a total of 6 dedicated trains, 3 LHB and 3 ICF trains. This way, there will be enough time for maintenance and bookings can be scheduled based on the train type for each day. Else it will create lot of problems in winter.